Engineering design of volumetric flow control system with a flow control range of 0-160MMscfd.
Provision of a class 300 flow control valve (FCV) with a range of 0- 160MMscfd.
Provision of 2Nos. class 300 isolation valves (Ball) for the FCV in item (ii) above.
Provision of a 12"class 300 main line isolation valve.
Provision of flow computers with an active and redundancy arrangement together with HMI panel.
Provision of field-mounted pressure, flow and temperature transmitters for the 2Nos. orifice metering streams.
Provision of an electronic flow controller (single loop or PLC).
Provision of associated piping and fittings.
Cabling between the field devices and control panel to achieve automatic control from the control room.
Blow-down and nitrogen-purging of the 12" segment downstream of metering and upstream of the outlet ESDV.
Provision of skid foundation for the volumetric flow control unit.
.
Modification of the metering outlet header to install the volumetric flow control unit.
Installation and commissioning of the volumetric flow control system.
Training of four NGPTC personnel (Operations and Maintenance).
Geregu Metering Station (NIPP Line)
Engineering design of volumetric flow control system with a flow control range of 0-120MMscfd.
Provision of a class 300 flow control valve (FCV) with a range of 0- 120MMscfd
Provision of 2Nos. class 300 isolation valves (Ball) for the FCV in item (ii) above.
Provision of an 18"class 300 main line isolation valve.
Provision of flow computers with an active and redundancy arrangement together with HMI panel.
Provision of field-mounted pressure, flow and temperature transmitters for the 2Nos. orifice metering streams.
Provision of an electronic flow controller (single loop or PLC).
Provision of associated piping and fittings.
Cabling between the field devices and control panel to achieve automatic control from the control room.
Blow-down and nitrogen-purging of the 18" x 1km sales line.
Provision of skid foundation for the volumetric flow control unit.
Modification of the 18" sales line to install the volumetric flow control unit.
Installation and commissioning of the volumetric flow control system.
Training of four NGPTC personnel (Operations and Maintenance).