Construction, Maintenance and Repairs of Pipelines and Flow lines [Offshore and Onshore] Projects

ENGINEERING, PROCUREMENT, CONSTRUCTION AND INSTALLATION OF 40” AJAOKUTA – KADUNA – KANO (AKK) TRANS NIGERIAN GAS PIPELINE PROJECT – SECTION B.

  • Client: BRENTEXCPP/ NIGERIAN NATIONAL PETROLEUM CORPORATION
  • Status: ONGOING PROJECT
  • Scope of work
    Specialized zones & encroachments crossing
    Block valves installation
    Pigging facilities
    Metering stations
    Terminal Gas stations
    Cathodic protection
    AC mitigation
    FOC conduit
    Markers and measuring post
    Temporary site facilities
    Temporary site utilities
    Temporary access roads
    Temporary security measures and installations
  • Category: EPCI

CONSTRUCTION OF A 30” & 26” SUBSEA BY-PASS PIPELINE AROUND THE ESCRAVOS -IMPORT BERTH PLATFORM.

  • Client: PIPELINES AND PRODUCTS MARKETING COMPANY
  • Status: ON-HOLD PROJECT
  • Scope of work
    Carry out detailed under water survey to determine the most workable route for the by-pass.
    Mobilisation and hire of a Multiservice work vessel suitable for
    depths of 20-30 meters of water and associated support Equipment.
    Procurement of 30” & 26” PE coated API X42, 13mm wall thickness Linepipes.
    Procurement of 30” & 26” SMART FLANGE with connectors, 30” x 26” Reducer and all appurtenances.
    Fabrication of a loop to link the two pipes segments.
    Cutting of the 30” & 26” pipeline segments at the sea bed and connecting the subsea pipelines using the SMART FLANGES and connectors at the sea bed.
    Provision and installation of concrete saddles designed to provide negative buoyance for the newly installed 30” pipeline segment.
    Hydro testing the line from SBM to Escravos Terminal and commissioning of the installed segment.
  • Category: CONSTRUCT

PROVISION OF REPAIRS, MAINTENANCE AND SECURITY SERVICES ON WARRI TO KADUNA PPMC CRUDE AND PRODUCTS PIPELINE SEGMENTS.

  • Client: PIPELINES AND PRODUCTS MARKETING COMPANY / MRS OIL & GAS LIMITED
  • Status: COMPLETED PROJECT
  • Scope of work
    Provision of detailed Work Execution Plan before commencement of all Repairs works, including discussion on the allocation of equipment needs.
    Participate in a Joint Investigation Visit (JIV) by excavation of damaged pipeline section and lifting section so that it can be inspected by JIV prior to commencing the intended repair works.
    Development of approved welding procedure.
    Procurement of required Clamp/pipes, flanges and bolts for replacement of damaged section.
    Repairs Works (Sectional Replacements, Parching, Clamping, Flanging).
    Installation of New Cathodic System
    Repair of TEG’s Station
    Clean up of work site (including clean- up of spills and disposal).
  • Category: CONSTRUCT

LEAK REPAIR & REHABILITATION OF NEWCROSS 1O” EKULAMA II PIPELINE. LOCATION: EKULAMA, RIVER STATE

  • Client: NEW CROSS
  • Status: COMPLETED PROJECT
  • Scope of work
    Provision of detailed Work Execution Plan before commencement of any construction works, including discussion on the allocation of equipment needs.
    Exposure of existing 10“ damaged/leaked pipeline, and lifting of the overcrossing pipelines.
    Participate in a Joint Investigation Visit (JIV) by excavation of damaged pipeline section and lifting section so that it can be inspected by JIV prior to commencing the intended repair works.
    Development of approved welding/ Clamp procedure.
    Procurement of required Clamp/pipes, flanges and bolts for replacement of damaged section.
    Removal of damaged section of pipeline.
    Installation and bolt-up of flanged repair spool section in position.
    Service testing of pipeline system to verify integrity of bolted flange connections.
    Recoating/taping of exposed/repaired areas, including bolted flange connections.
    Lowering of line into trench and backfilling of access.
    Clean up of work site (including clean-up of spills and disposal)
  • Category: CONSTRUCT

REPAIR OF BLAST POINTS AT INIKOROGHA AND AZAMA IN IBAFAN CREEKS AND HYDRO-TESTING OF THE 24" X 60KM ESCRAVOS - WARRI PIPELINE AND REPAIR OF POSSIBLE LEAK POINTS.

  • Client: PIPELINES AND PRODUCTS MARKETING COMPANY / OCEAN MARINE SOLUTIONS
  • Status: COMPLETED PROJECT
  • Scope of work
    Mobilization of resources to leak repair location
    Excavation of pipe trench for pipe lifting.
    Exposure of the blasted portion of the pipeline.
    Joint Inspection visit of Leak point for repair.
    Lifting of 24” Pipeline section
    Removal of coating.
    Cutting off damaged areas of the 24” pipeline section using Cold cutter
    Plugging of pipe end before hot work.
    Cleaning and Preparation of 24” pipe end for fit up
    Fit up and Welding of replacement pipe (upstream)
    Fit up and Welding of replacement pipe (downstream)
    Radiographic inspection of the welded joints.
    Coating / Wrapping of Welded joints
    Lowering of pipeline section into trench and Backfilling
  • Category: CONSTRUCT

CONSTRUCTION OF 20KM OF THE DUAL 10’ X 65KM AND 6” X 20KM PL FORM OWA-OLADINMA – OGHAREFE

  • Client: PAN OCEAN OIL CORPORATION
  • Status: COMPLETED PROJECT
  • Scope of work
    ENGINEERING
    CONSTRUCTION
    PIPE HANDLING
    TANSPORTATION OF LINEPIPES
    COMMUNITY AFFAIRS MANAGEMENT
    RIGHT OF WAY RECONNAISSANCE SURVEY/BUSH CLEARING
    STRINGING LINE PIPES
    WELD & LAY
    PRECOMMISSIONING
    INSTALLATION
    LOWER-IN & BACK FILLING
    CIVIL WORKS
    COMMISSIONING & OPERATION OF THE FACILITIES
    FABRICATION & INSTALLATION OF PIG LAUNCHER AT UPSTREM END
    HOOKUP/TIE-IN AT THE CRUDE INTAKE FACILITIES
  • Category: CONSTRUCT

REPAIR OF ESCRAVOS FIREWATER TANK.LOCATION ESCRAVOS.

  • Client: CHEVRON
  • Status: COMPLETED PROJECT
  • Scope of work
    Premobilization and Mobilization of Resources
    Development of WPS
    Procurement of Consumables
    Sweep Blasting of Tank surface
    Installation of Lighting and Extractor Fans
    Fabrication of plates for Installation
    Welding
    NDT
    Scaffolding Set-up
    Blasting & Painting
    Leak Testing
    Cathodic Installation
    Commissioning of Tank
  • Category: CONSTRUCT

REPAIR OF OLERO-ABITEYE 18” PIPELINE/SERVICE TEST AT BP21, BP24 & BP25.

  • Client: CHEVRON NIG. LTD
  • Status: COMPLETED PROJECT
  • Scope of work
    EXPOSURE OF EXISTING DAMAGED PIPELINE SECTION
    LIFTING OF THE PIPELINE
    COLD CUTTING OF THE DAMAGED SECTION FROM PIPELINE
    WELDING OF FLANGES ONTO PIPELINE ENDS
    INSTALLATION OF PREFABRICATED HYDROTESTED FLANGED SPOOL CONSTRUCTION
    PROVISION OF ENGINEERING LIFTING CALCULATIONS FOR COMPANY APPROVAL PRIOR TO LIFTING THE PIPELINE
    COMMUNITY AFFAIR MANAGEMENT
    WELD
    FIELD JOINT COATING AND WRAPPING
    LOWER-IN & BACK FILLING
    COMMISSIONING
  • Category: CONSTRUCT

UMUSADEGE-KWALE 8” X 4.2KM PIPELINE CONSTRUCTION. INCLUSIVE OF NDT.

  • Client: PLATFORM PETROLEUM
  • Status: COMPLETED PROJECT
  • Scope of work
    MOBILISATION OF RESOURCES TO SITE
    PROJECT MANAGEMENT
    PREPARATION OF FLOWLINE RIGHT OF WAY & ACCESS ROAD
    STRINGING OF PIPELINE
    WELDING OF PIPELINE
    NON DESTRUCTIVE TESTS
    CATHODIC PROTECTION
    DITCHING & BACKFILLING
    DEMOBILISATION OF RESOURCES FROM SITE
    PROVISION OF AS-BUILT DOCUMENTS
  • Category: CONSTRUCTION

UMUTU-UMUSADEGE 6” X 11.5KM PIPELINE CONSTRUCTION, INCLUSIVE OF NDT.

  • Client: PLATFORM PETROLEUM
  • Status: COMPLETED PROJECT
  • Scope of work
    ENGINEERING
    CONSTRUCTION
    PIPE HANDLING
    RANSPORTATION OF LINEPIPES
    COMMUNITY AFFAIRS MANAGEMENT
    BUSH CLEARING
    STRINGING LINEPIPES
    WELD & LAY
    FIELD JOINT COATING AND WRAPPING
    INSTALLATION
    PRECOMMISSIONING
    LOWER –IN & BACK FILLING
    CIVIL WORKS
    COMMISSION AND OPERATION OF THE FACILITIES
    FABRICATION AND INSTALLATION OF PIG LAUNCHER AT UPSTREAM END
    HOOKUP/TIE IN
  • Category: CONSTRUCTION

OLERO RMP-9 FLOWLINES/STRUCTURAL REPAIRS, INCLUSIVE OF NDT.

  • Client: DEMACK/CHEVRON (SUBCONTRACT)
  • Status: COMPLETED PROJECT
  • Scope of work:
  • Category: CONSTRUCTION