Engineering, Procurement, Construction & Installation Of Oil & Gas Process Facilities [Offshore & Onshore]

ENGINEERING, PROCUREMENT, CONSTRUCTION AND INSTALLATION OF 40” AJAOKUTA – KADUNA – KANO (AKK) TRANS NIGERIAN GAS PIPELINE PROJECT – SECTION B.

  • Client: BRENTEXCPP/ NIGERIAN NATIONAL PETROLEUM CORPORATION
  • Status: ONGOING PROJECT
  • Scope of work
    Specialized zones & encroachments crossing
    Block valves installation
    Pigging facilities
    Metering stations
    Terminal Gas stations
    Cathodic protection
    AC mitigation
    FOC conduit
    Markers and measuring post
    Temporary site facilities
    Temporary site utilities
    Temporary access roads
    Temporary security measures and installations
  • Category: EPCI

ENGINEERING, PROCUREMENT, CONSTRUCTION AND INSTALLATION OF PIPELINE, GAS PROCESSING FACILITIES AT DUPORT ENERGY PARK

  • Client: DUPORT MIDSTREAM COMPANY LIMITED/SUMMIT OIL
  • Status: ONGOING PROJECT
  • Scope of work
    Mobilization of all CONTRACTOR’s facilities, offices, workshops, equipment, temporary facilities to site.
    Detailed topographical, geophysical and geotechnical survey of pipeline route from Otien1 Manifold to the Energy park and NGC ELPS Tie-In Point.
    Procurement of 8 Inches 3LPE Coated Line Pipes, Fittings, Consumables and other Materials Required for the Construction Works
    Provision of necessary permits required for the construction of the pipeline within contractors’ scope.
    Construction and Installation of the 1no 8 inches x 4km and 2no 8”x295m pipeline (Which shall include Bush clearing of ROW, Stringing, ditching, Welding of line pipes, field joint coating and wrapping, Tie-in of pipeline, Lowering and backfilling
    Procurement and installation of cathodic protection system - sacrificial anode
    Fabrication, construction and installation of hook up facility at Otien well1 and ELPS inlet injection point
    Pre-commissioning/commissioning works
    Community affairs management
    Site cleanup, re-instatement and demobilization
    Submission of As-built documents
    Provision of FEED and Detailed Engineering Design
    Supply, installation and commissioning of Scrubber skid
    Supply, installation and commissioning of Heater skid
    Supply, installation and commissioning of Compressors / Cooler skid
    Supply, installation and commissioning Gas metering and pressure control systems skid
    Supply, installation and commissioning of the Utilities/Balance of plant (Emergency vent system, Liquid handling facilities, Instrument Gas System etc.)
    Provision of Site Civil Construction
    Pre-commissioning and Commissioning for the Gas Processing Facility (GPF)
  • Category: EPCI

ENGINEERING, PROCUREMENT, INSTALLATION AND COMMISSIONING OF SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA)SYSTEM FOR NIGERIAN GAS COMPANY LIMITED (NGC)-CONSORTIUM

  • Client: NIGERIAN NATIONAL PETROLEUM CORPORATION
  • Status: ONGOING PROJECT
  • Scope of work
    Survey of existing control systems.
    Detailed Engineering Design of SCADA System.
    Procurement of SCADA Panel components and accessories.
    Procurement of Telecommunication Equipment.
    RTU Panel Assembly
    Installation of RTU Panels, HMIs, SCADA Software.
    Installation of Telecommunications systems (Routers, Switches, Microwave Radios, Servers, UPS systems).
    Integration of all control panels to SCADA network.
    Pipeline monitoring.
  • Category: EPCI

ENGINEERING, PROCUREMENT AND CONSTRUCTION CONTRACT FOR THE REHABILITATION/UPGRADE OF DELTA IV METERING STATION

  • Client: NIGERIAN NATIONAL PETROLEUM CORPORATION
  • Status: ONGOING PROJECT
  • Scope of work
    Mobilization of all equipment, machinery, material and manpower for the rehabilitation/upgrade works.
    Verification of Front-end Engineering Design (FEED) deliverables and development of Detailed Engineering Design for the rehabilitation/upgrade works including follow-on engineering to the completion of the project.
    Integrity and functional testing of existing station equipment, piping and ancillary systems and recertification of equipment/systems to be retained.
    Decommissioning of existing control panel, calorimeter, non-functional valves & equipment and preservation for re-use or disposal of same as applicable and appropriate.
    Provision and installation of Filter Separator, Firewater Storage Tank, Water treatment plant and associated water distribution lines as applicable, and Condensate pump system including all ancillary equipment, associated materials interconnecting piping and Civil works.
    Demolition of existing control building and security building and construction of a new control building and security building.
    Provision and installation of all valves, piping, fittings, flanges and specialty items required for the rehabilitation/upgrade works.
    Installation of LEC-DAS lightning protection system to cover the entire metering station facilities.
    Provision and installation of Distributed Control System (DCS) with Human Machine Interface (HMI) complete with Process Control System (PCS) and automation of the station.
    Design and construction of all civil/structural structures, equipment supports, access road, drainage including landscaping, painting and new septic tank, soak-away pit including plumbing and inspection chamber works for the rehabilitation works.
    Relocation of existing cold vent system and connection of all vent points to the cold vent.
    Provision and installation of chromatograph, instrument and control bulk items, cables glands, telecommunications systems, UPS system, Marshalling cabinet and electrical fittings.
    Reactivation of firewater system, fire and gas system, station lighting system, electrical switching systems for the metering station.
    Pre-commissioning, commissioning, start-up and handover of station.
    Development of As-Built drawings, Operations & Maintenance Manuals and submission of report for the rehabilitation/upgrade works
    Project Management, Training and Support to the Employer’s designated personnel.
    Demobilization of all equipment, machinery, material and manpower for the rehabilitation/upgrade works.
  • Category: EPCI

ENGINEERING DESIGN, PROCUREMNET AND CONSTRUCTION (EPC) FOR GAS SUPPLY TO SONIA FOODS LIMITED

  • Client: NIGERIAN GAS MARKETING COMPANY LIMITED
  • Status: COMPLETED PROJECT
  • Scope of work
    DETAILED TOPOGRAPHICAL (INCLUDING POPULATION DENSITY), GEOPHYSICAL AND GEOTECHNICAL SURVEYOF THE 1.89KM PIPELINE ROUTE FROM EXISTING NGMC FACILITY AT NIGER BISCUIT OGIJO TO SONIA FOOD PLANT
    ENGINEERING, PROCUREMENT, CONSTRUCTION, INSTALLATION, TESTING AND COMMISSIONING OF:
    4” X 1.89KM CLASS 150 GAS DISTRIBUTION PIPELINE AND ASSOCIATED FITTINGS FROM NIGER BISCUIT PRMS TO SONIA FOODS
    TIE-IN OF 4” PIPELINE, BETWEEN PRESSURE REGULATION AND METERING, ON THE 3” PIPE SPOOL INTERCONNECTING THE TWO STREAMS OF THE EXISTING 2MMSCFD NIGER BISCUIT METERING STATION BY INTRODUCTION OF FLANGED-TEE PIPE SPOOL, ISOLATING BALL VALVE AND 3” TO 4” EXPANDER
    2NOS TURBINE METER (0.05-0.5MMSCFD), 1NO FILTER, 2NOS PRESSURE GAUGE AND ASSOCIATED INSTRUMENTATION AT SONIA FOOD PLANT
    SUPPLY AND INSTALLATION OF 6NOS 4” MAINLINE ISOLATION VALVE-TEE FOR FUTURE TIE-IN AND ISOLATION VALVES FOR METERING SKID UNITS
    PROVISION OF BASE AND SHELTER FOR THE TURBINE METER SKID AND CONSTRUCTION OF CHAIN LINK FENCING FOR THE FACILITY
    BONDING OF EXISTING PERMANENT CATHODIC PROTECTION TO TH NEW PIPELINE SYSTEM
    PREPARATION ANS SUBMISSION OF AS-BUILT DRAWINGS AND OPERATIONS AND MAINTENANCE (O&M) DOCUMENTATION
    PROVISION OF TRAINING FOR NGMC PERSONNEL ON THE OPERATION AND MAINTENANE OF THE MAJOR EQUIPMENT SUPPLIED
  • Category: EPCI

ENGINEERING DESIGN, PROCUREMNET AND CONSTRUCTION (EPC) FOR GAS SUPPLY TO REAL INFRASTRUCTURE LIMITED

  • Client: NIGERIAN GAS MARKETING COMPANY LIMITED
  • Status: COMPLETED PROJECT
  • Scope of work
    DETAILED TOPOGRAPHICAL (INCLUDING POPULATION DENSITY), GEOPHYSICAL AND GEOTECHNICAL SURVEYOF ABOUT 1.2KM PIPELINE ROUTE TO REAL INFRASTRUCTURE
    ENGINEERING, PROCUREMENT, CONSTRUCTION, INSTALLATION, TESTING AND COMMISSIONING OF:
    TIE-IN OF 4” PIPELINE DOWNSTREAM (BEFORE METERING) ON THE EXISTING METAFRIQUE METERING STATION BY HOOKING UO TO THE EXISTING 4” VAVLE
    4” X 1.2KM CLASS 150 GAS PIPELINE SYSTEM AND ASSOCIATED FITTINGS FROM METAFRIQUE PRMS TO REAL INFRASTRUCTURE
    2NOS TURBINE METER(0.1-0.5MMSCFD), 2NOS FILTERS, 2NOS PRESSURE GAUGE AND ASSOCIATED INSTRUMENTATIONAT REAL INFRASTRUCTURE PLANT
    SUPPLY AND INSTALLATION OF 6NOS 4” ISOLATION VALVES, 1 NO VALVE-TEE FOR FUTURE TIE-IN
    BASE AND SHELTER FOR THE TURBINE METER SKID
    BONDING OF EXISTING PERMANENT CATHODIC PROTECTION SYSTEM TO THE NEW PIPELINE SYSTEM
    PREPARATION AND SUBMISSION OF APPROVED DETAILED ENGINEERING DESIGN, AS-BUILT AND OPERATION AND MAINTENANCE (O&M) DOCUMENTATION
    PROVISION OF ON-SITE TRAINING OF NGMC PERSONNEL ON THE OPERATIONS AND MAINTENANCE OF THE MAJOR EQUIPMENT SUPPLIED
  • Category: EPCI

ENGINEERING, PROCUREMENT, CONSTRUCTION AND INSTALLATION OF VOLUMETRIC FLOW CONTROL SYSTEM LOT II AT NIPP SAPELE AND GEREGU METERING STATIONS

  • Client: NIGERIAN GAS PROCESSING AND TRANSPORTATION COMPANY LIMITED
  • Status: COMPLETED PROJECT
  • Scope of work
    Engineering design of volumetric flow control system with a flow control range of 0-160MMscfd.
    Provision of a class 300 flow control valve (FCV) with a range of 0- 160MMscfd.
    Provision of 2Nos. class 300 isolation valves (Ball) for the FCV in item (ii) above.
    Provision of a 12"class 300 main line isolation valve.
    Provision of flow computers with an active and redundancy arrangement together with HMI panel.
    Provision of field-mounted pressure, flow and temperature transmitters for the 2Nos. orifice metering streams.
    Provision of an electronic flow controller (single loop or PLC).
    Provision of associated piping and fittings.
    Cabling between the field devices and control panel to achieve automatic control from the control room.
    Blow-down and nitrogen-purging of the 12" segment downstream of metering and upstream of the outlet ESDV.
    Provision of skid foundation for the volumetric flow control unit.
    Modification of the metering outlet header to install the volumetric flow control unit.
    Installation and commissioning of the volumetric flow control system.
    Training of four NGPTC personnel (Operations and Maintenance).
    Geregu Metering Station (NIPP Line)
    Engineering design of volumetric flow control system with a flow control range of 0-120MMscfd.
    Provision of a class 300 flow control valve (FCV) with a range of 0- 120MMscfd
    Provision of 2Nos. class 300 isolation valves (Ball) for the FCV in item (ii) above.
    Provision of an 18"class 300 main line isolation valve.
    Provision of flow computers with an active and redundancy arrangement together with HMI panel.
    Provision of field-mounted pressure, flow and temperature transmitters for the 2Nos. orifice metering streams.
    Provision of an electronic flow controller (single loop or PLC).
    Provision of associated piping and fittings.
    Cabling between the field devices and control panel to achieve automatic control from the control room.
    Blow-down and nitrogen-purging of the 18" x 1km sales line.
    Provision of skid foundation for the volumetric flow control unit.
    Modification of the 18" sales line to install the volumetric flow control unit.
    Installation and commissioning of the volumetric flow control system.
    Training of four NGPTC personnel (Operations and Maintenance).
  • Category: EPCI

PROVISION OF VOLUMETRIC CONTROL SYSTEM AT NGC EGBIN METERING STATION.

  • Client: NIGERIAN GAS COMPANY LIMITED
  • Status: COMPLETED PROJECT
  • Scope of work
    Engineering design, procurement and installation of a 16″volumetric flow control Valve.
    Provision and installation of 2Nos. 16″ ball valves for isolating the volumetric flow control valve.
    Provision and installation of 30″main line valve (electro-pneumatically actuated) on the 30″ PHCN gas sales line.
    Provision and installation of 1 No. 2″ vent valve downstream of the 16″ inlet isolation valve and upstream of the volumetric control valve.
    Provision and installation of 1No. flow computer.
    Provision and installation of 6Nos. Differential pressure transmitters (smart type).
    Provision and installation of 6Nos. pressure transmitters (smart type).
    Provision and installation of 6Nos. temperature transmitters (smart type).
    Provision and installation of single loop controller with provision to be integrated into the main control panel.
    Provision of associated pipings and fittings to achieve complete loop.
    Cabling between field devices and control panel to achieve automatic control from the control room.
    Excavation of a portion of the 30″ sales line to PHCN for the installation of the volumetric control unit.
    Hot-cutting and modification of 30″sales line to provide for weld-on equal Tee, bypass for Installation of volumetric flow control valve and 30″ main line valve.
    Blow down and nitrogen purging of the 30″ x 3km Sales line to Egbin Power Plant.
    Carry out piping works with associated fittings to install volumetric flow control system
    Commissioning of the volumetric control system.
  • Category: EPCI

ENGINEERING, PROCUREMENT, CONSTRUCTION, INSTALLATION & COMMISSIONING OF GAS SUPPLY INFRASTRUCTURE TO BN CERAMICS.

  • Client: NIGERIA GAS COMPANY LIMITED
  • Status: COMPLETED PROJECT
  • Scope of work
    Detailed site structural design specifications for Foundations and civil works.
    DETAILED CONSTRUCTION SPECIFIATION
    PROCUREMENT/INSTALLATION OF PRMS & FLOW COMPUTER SYSTEM.
    PIPELINE CONSTRUCTION AND COMMISSIONING
    PROVISION/TESTING/CERTIFICATION OF ALL PIPING AND INSTALLATIONS
    PROVISION OF ALL EQUIPMENT REQUIRED TO EXECUTE THE CONSTRUCTION SCOPE
    PREPARATION OF AS-BUILT DRAWING, OPERATION AND MAINTENANCE OF STATION EQUIPMENTS
    PROVISION OF ON THE JOB TRAINING TO CLIENT PERSONNEL
  • Category: EPCI

ENGINEERING VERIFICATION CONSTRUCTION AND INSTALLATION OF PIG RECEIVER FACILITIES & LACT UNIT AT ERIEMU – INCLUSIVE OF NITROGEN PURGING OF 12” X 51KM FROM UMUSADEGE TO ERIEMU.

  • Client: UMUGINI ASSET COMPANY LIMITED
  • Status: COMPLETED PROJECT
  • Scope of work
    Fabrication Of Above Ground Piping's
    Installation Works Pre-fabrication Of Structures, Supports And Skids For LACT
    Unit And Pig Launcher/Receiver Prefabrication Of Pig Launcher/Receiver
    Connections And Installation Of LACT Unit
    Civil And Foundation Works Around The Facilities
    Tagging & Coding/Identification Of Joints
    Electrical And Instrumentation Works
    Hook Up And Tie In At Pig Launcher/Receiver
    Installation Of Chainlink Fencing And Landscaping
  • Category: EPCI

ENGINEERING, PROCUREMENT AND CONSTRUCTION OF 4’X 1KM, 4” X 1KM, 4” X 1KM, 4” X 1KM, 4” X 1KM, 6” X 2KM EXPORT PIPELINES AND FLOWLINES.

  • Client: OANDO QUA IBO LIMITED
  • Status: COMPLETED PROJECT
  • Scope of work
    PROCUREMENT OF LINEPIPES, VAVLES, FITTINGS E.T.C.
    HANDLING OF LINEPIPES.
    TRANSPORTATION OF PIPES.
    MOBILIZATION OF LINEPIPES.
    SITE PREPARATION, TRENCHING, LOWERING, BACKFILLING AND RE-INSTATEMENT WHERE NEEDED.
    THRUST BORING ACROSS THE MOBIL-QUA-IBO ROAD.
    MECHANICAL COMPLETION, PRE-COMMISSIONING AND COMMISSIONING WORKS WHICH INCLUDES STANDARD HYDRO TESTING, CLEANING PURGING.
    FINAL TIE-IN TO THE WELL HEAD AND THE CRUDE PRODUCTION FACILITY.
  • Category: EPCI

ENGINEERING, PROCUREMENT, CONSTRUCTION, INSTALLATION & COMMISSIONING OF GAS SUPPLY TO LIFE FLOUR MILL.

  • Client: NIGERIAN GAS COMPANY LIMITED
  • Status: COMPLETED PROJECT
  • Scope of work
    DETAILED SITE GEOTECHNICAL INVESTIGATION AND FINAL STRUCTURAL DESIGN SPECIFICATION FOR FOUNDATIONS AND CIVIL WORKS.
    DETAILED CONSTRUCTION SPECIFICATIONS.
    PROCUREMENT/INSTALLATION OF GAS FLOW METERING STATION (TURBINE) ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING.
    PROVISION/TESTING/CERTIFICATION OF ALL PIPING AND INSTALLATION.
    PROVISION OF ALL EQUIPMENT REQUIRED TO EXECUTE THE CONSTRUCTION SCOPE.
    PREPARATION OF AS-BUILT DRAWING, OPERATION AND MAINTENANCE OF STATION EQUIPMENTS.
    PROVISION OF ON THE JOB TRAINING TO CLIENT PERSONNEL.
  • Category: EPCI

ENGINEERING, PROCUREMENT, CONSTRUCTION, INSTALLATION & COMMISSIONING OF EHGC 18”- 24” NIPP GAS PIPELINE INTER-CONNECTION PROJECT.

  • Client: OANDO PLC
  • Status: COMPLETED PROJECT
  • Scope of work
    SITE AND DATA VERIFICATION. INCLUDING GEOTECHNICAL INVESTIGATION AND FINAL
    STRUCTURAL DESIGN SPECIFICATIONS FOR FOUNDATIONS AND CIVIL WORKS
    DETAILED DESIGN OF INTER-CONNECTING SYSTEM AND HAZID & HAZOP THE DESIGN
    DEVELOP DETAILED CONSTRUCTION SPECIFICATIONS PROCEDURES AND OBTAIN CLIENT APPROVAL
    PROCUREMENT PLAN MTO – ALL MATERIALS REQUIRED FOR THE PHASE 1 SCOPE
    PRE-MOBILISATION OF ALL EQUIPMENT REQUIRED TO EXECUTE THE FABRICATION, HOT-TAP AND CONSTRUCTION SCOPE
    CONSTRUCTION DESIGN/BOM, CIVIL/STRUCTURAL (SECURITY FENCE, PIPING SUPPORTS, HOT TAP, VALAVE PITS, ISOLATION VALVES (5NOS) AND MANUAL VOLUME CONTROL VALVE 91NO LAST VALVE CLOSEST TO THE 24’X10” BARRED TEE) AND PIPING WORKS ETC)
    FABRICATION AND CONSTRUCTION OF INTERCONNECTING PIPING AND PIPE SUPPORTS
    PRE-COMMISSIONING WORKS – SUCCESSFUL TESTING/CERTIFICATION OF ALL PIPING AND INSTALLATIONS, NON-DESTRUCTIVE TESTS (RADIOGRAPHY), MPI AND DPI FOR HYDRO-TESTING OF THE CONNECTING SPOOL(S)
    INSTALLTION, HOOK-UP AND COMMISSIONING
    INSTALLATION OF ACCESS CONTROL FENCE AROUND THE PIPING AND VALVES AND AS-BUILT DOCUMENTATION
    SITE REINSTATEMENT AND DEMOBILISATION FROM SITE
  • Category: EPCI

Installation of north and south compressor station concrete barge at cnl olero and dibi flowstation.

  • Client: AVEON OFFSHORE LIMITED/CHEVRON NIGERIA LIMITED
  • Status: COMPLETED PROJECT
  • Scope of work
    MOBILISATION OF RESOURCES TO DIBI SITE
    WELDING OF 12NO.S PILES (24NO.S JOINT X 16”)
    I
    NSTALLATION OF 12NO.S RESTRAINING PILES
    CORRECTION OF EXISTING SAND PAD AND ALL REMEDIAL WORKS TO ALLOW FOR PASITORY OF THE SOUTH COMPRESSOR STATION (SCS) CONCRETE BARGE AT DIBI
    DEMOB OF ALL RESOURCES FROM SITE
  • Category: EPCI

ENGINEERING, PROCUREMENT, CONSTRUCTION & INSTALLATION OF INTERMEDIATE PIGGING STATION AT IBESIKPO IN CALABAR. (INCLUSIVE OF CIVIL CONSTRUCTION WORKS, ELECTRICALS, NDT, PAINTING & COATING).

  • Client: EAST HORIZON GAS COMPANY/OANDO PLC
  • Status: COMPLETED PROJECT
  • Scope of work
    ENGINEERING.
    PROCUREMENT OF LINEPIPES, VALVES, FITTINGS E.T.C.
    HANDLING AND TRANSPORTATION OF LINEPIPES.
    TIE-IN LOCATION FIELD INSPECTIONS AND DATA VERIFICATION.
    SITE GEOTECHNICAL INVESTIGATION AND FINAL STRUCTURAL DESIGN SPECIFICATIONS FOR FOUNDATIONS AND CIVIL WORKS.
    DETAILED CONSTRUCTION SPECIFICATIONS
    BYPASS PIPING INSTALLATION
    HOT-TAPPING OF 18”UNICEM GAS PIPELINE
    PRE-COMMISSIONING OF THE BYPASS SECTION
    N2 PURGING OF THE BYPASS SECTION
    PROVISION/TESTING/CERTIFICATION OF ALL PIPING AND INSTALLATION
    FABRICATION AND CONSTRUCTION OF INTERCONNECTING PIPING AND PIPE SUPPORTS
    FABRICATION AND CONSTRUCTION OF INTERCONNECTING PIPING AND PIPE SUPPORTS
    PROVISION OF ALL EQUIPMENT REQUIRED TO EXECUTE THE CONSTRUCTION SCOPE
    PRE-CONSTRUCTION RISK ASSESSMENT
    NON-DESTRUCTIVE TESTS/RADIOGRAPHY
    PERIMETER FENCING
  • Category: EPCI

INSTALLATION OF16''PIPES X 64 NO. S PILES AT ESCRAVOS ON THE EPWD PROJECT.

  • Client: GRAMEN/PIVOT/CNL
  • Status: COMPLETED PROJECT
  • Scope of work
    MOBILISATION OF CREW TO CHEVRON HELIPAD
    PROJECT PREPARATORY WORKS
    FUNCTIONAL TEST
    COUPLING AND SET-UP OF PILING RIG ON SITE
    BARRICADE OF SITE AND MOVEMENT OF EQUIPMENT TO CNL DOCK
    COUPLING & DECOUPLING OF PILE RIG
    FABRICATING OF PILE SHOES
    FITTING OF PILE JOJNTS
    WELDING OF PILE JOINTS
    SITE CLEAN UP & DEMOBILISATION
  • Category: EPCI