PRECOMMISSIONING OF 24” X 15.1KM AKRI GAS PIPELINE PROJECT.

  • Client: AMAZON ENERGY/AGIP
  • Status: COMPLETED PROJECT
  • Scope of work
    Survey and Detailed Engineering Design
    Procurement of SCADA hardware (Specific items shall be advised by consortium upon completion of survey);
    Overall SCADA Project system integration, pre-commissioning and commissioning
    SCADA software and licenses;
    Telecommunications hardware (VSATs, Modems etc.);
    Telecommunications software and licenses;
    Other Ancillary Services Necessary to Achieve the scope objectives
  • Category: PRE-COM

PROVISION OF PRECOMMISSIONING, COMMISSIONING AND STARTUP OF 20” X 40KM BULK PIPELINE SERVICES, INCLUDING INTELLIGENT PIGGING FOR K2S PROJECT.

  • Client: NESTOIL LIMITED/SHELL PETROLEUM DEVELOPMENT COMPANY
  • Status: COMPLETED PROJECT
  • Scope of work
    Provision of all required manpower and equipment and procedures for the 20" bulk gas pipeline pre-commissioning.
    Provision of pre-commissioning schedule, test plan and procedures for the 20" bulk gas pipeline pre-commissioning.
    Fabrication and provision of Temporary pigging facility, blind flanges, and test head spools for the purposes of the pre-commissioning works should permanent pig traps and SDV's not be ready.
    Exploratory pigging for Cleaning of the 20” gas pipeline using foam, mechanical, Magnetic brush and gauge pigs to a level acceptable by CLIENT.
    Isolation works, Complete filling with inhibited clean water using corrosion inhibitors and hydro-testing of entire 2oinch gas pipeline.
    Bulk dewatering of pipeline.
    Pipeline drying to a dew point value of -20°C
    Caliper & Intelligent pigging Surveys together with submission of all required reports on the 20" bulk pipeline surveys.
    Provision of suitable water for the pre-commissioning of the bulk-line.
    Provision of all necessary equipment and tools required for effluent management services to meet DEP standards.
    Provision of effluent management services to manage the waste water from the pre- commissioning of the bulk-line in such a manner as to meet environmental regulations.
    Provision of effluent management documentation and procedure stating method for managing contaminated waste water which falls short of environmentally acceptable standards other than discharge into the river or ground.
    Nitrogen Purging Preservation of entire pipeline & Piping to a 2% oxygen level @ 2barg. (Optional scope).
    Prior to introduction of hydrocarbon, Nitrogen purging of the entire pipeline and piping up to 2% of oxygen level shall be carried out. (Optional scope).
  • Category: PRE-COM

PROVISION OF PRECOMMISSIONING AND PRESSURE TESTING SERVICES FOR WELLS 039L/S,45L/S, AND 27L BY 4” FLOWLINE STRING OF JONES CREEK OML-42 RE-ENTR PROJECT.

  • Client: NESTOIL LIMITED/SHELL PETROLEUM DEVELOPMENT COMPANY
  • Status: COMPLETED PROJECT
  • Scope of work
    MOBILIZATION OF EQUIPMENT
    RIG-UP OF HYDROTESTING EQUIPMENT
    HOOK-UP OF HYDROTESTING EQUIPMENT
    PROOF PIGGING8
    ILLING /CLEANING
    HYDROTESTING PIPELINE
    FILLING / STABILIZATION OF PIPELINE
    PRESSURISING
    DE-PRESSURISING OF PIPELINE
    DRYING
  • Category: PRE-COM

PRE-COMMISSIONING OF 24” x 12Km PIPELINE SEGMENT OF TEPNG’S NOPL PIPELINE.

  • Client: NIGERIA GAS COMPANY LIMITED / ALLIED MECHANICAL & PIPELINE SERVICES LIMITED
  • Status: COMPLETED PROJECT
  • Scope of work
    MOBILIZATION OF EQUIPMENT
    COMMUNITY ENGAGEMENT
    RIG-UP OF HYDROTESTING EQUIPMENT
    HOOK-UP OF HYDROTESTING EQUIPMENT
    PROOF PIGGING OF GAS LINE
    PROOF PIGGING OF LINE WIH COMPRESSED AIR."
    FILLING /CLEANING PL"
    HYDROTESTING OF GAS PIPELINE "
    FILLING / STABILIZATION OF PIPELINE
    PRESSURISING
    DE-PRESSURISING THE PIPELINE"
    DEWATERING OF PIPELINE "
    DRYING
  • Category: PRE-COM

PRE-COMMISSIONING OF 24” x 55Km ELPS ESCRAVOS - LAGOS PIPELINE PROJECT.

  • Client: NIGERIA GAS COMPANY LIMITED
  • Status: COMPLETED PROJECT
  • Scope of work
    MOBILIZATION OF EQUIPMENT
    COMMUNUTY ENGAGEMENT
    PRECOMMISSIOONING WORKS
    RIG-UP OF NIGROGEN MEMBRANE
    NITROGEN PACKNIG OF LINE
  • Category: PRE-COM

PRE-COMMISSIONING & COMMISSIONING WORKS FOR CHEVRON OFFSHORE DOMESTIC SUPPLY OBLIGATION (DSO) PROJECT. (PHASE 1 & 2)

  • Client: HHI/CNL
  • Status: COMPLETED PROJECT
  • Scope of work
    Engineering
    Procurement of Steel Materials
    Construction & Fabrication of Traps
    Installation of Launchers & Receivers
    Tagging & Coding/Identification Of Spools
    Transportation of Fabrication materials
    Cleaning
    Filling
    Hydro testing
    Leak Testing
    Dewatering
    Drying
    Nitrogen Purging & Packing
  • Category: PRE-COM

PRE-COMMISSIONING OF 12” X 6.5KM IKORODU TO OGIJO GASLINE PIPELINE PROJECT.

  • Client: FALCON PETROLEUM
  • Status: COMPLETED PROJECT
  • Scope of work
    MOBILIZATION OF EQUIPMENT
    COMMUNUTY ENGAGEMENT
    RIG-UP OF HYDROTESTING EQUIPMENT
    HOOK-UP OF HYDROTESTING EQUIPMENT
    PROOF PIGGING OF 12" X 6.5KM GAS LINE USING COMPRESSED AIR
    FILLING /CLEANING 12" X 6.5KM PL"
    HYDROTESTING OF 12" X 6.5KM GAS PIPELINE "
    FILLING / STABILIZATION OF PIPELINE
    PRESSURISING
    DE-PRESSURISING THE 12" X 6.5KM PIPELINE"
    DEWATERING OF 12" X 6.5KM PIPELINE "
    DRYING
    NITROGEN PURGING OF THE 2" X 6.5KM PIPELINE
  • Category: PRE-COM

FLUSHING/CLEANING, HYDROTESTING, DEWATERING, GAUGING, DRYING, PURGING AND INTRODUCTION OF NATURAL GAS INTO THE 24” X 56KM ESCRAVOS WARRI PIPELINE PROJECT.

  • Client: NIGERIA GAS COMPANY LIMITED
  • Status: COMPLETED PROJECT
  • Scope of work
    MOBILIZATION OF EQUIPMENT
    COMMUNITY ENGAGEMENT
    RIG-UP OF HYDROTESTING EQUIPMENT
    HOOK-UP OF HYDROTESTING
    HYDROTESTING EQUIPMENT
    FILLING/STABILIZATION OF PIPELINE
    PRESSURISING
    DE-PRESSURISING
  • Category: PRE-COM

PRECOMMISIIONING OF 18’’ X 128KM GAS TRANSMISSION PIPELINE.

  • Client: OILSERV LIMITED
  • Status: COMPLETED PROJECT
  • Scope of work
    MOBILIZATION OF RESOURCES TO SITE
    CLEANING AND FILLING OF LINE
    HYDROTEST OF LINE
    DEWATERING OF LINE
    DRYING OF LINE
    PURGING OF LINE
    SITE CLEAN UP
    DEMOBILIZATION
  • Category: PRE-COM

OLERO 18’’ X 3.5KM SECTIONAL INTERGRITY ASSESSMENT, REPLACEMENT AND HYDROTEST.

  • Client: CHEVRON NIG. LTD
  • Status: COMPLETED PROJECT
  • Scope of work
    PROCEDURE QUALIFCATION
    MOBILIZATION OF RESOURCES TO SITE (SETTING OUT OF RESOURCES
    CLEANING AND FILLING OF LINE
    HYDROTEST OF LINE
    DEWATERING OF LINE
    DRYING OF LINE
    PURGING OF LINE
    SITE CLEAN UP
    DEMOBILIZATION
  • Category: PRE-COM

12” & 24” HYDROTESTING OF RIVER CROSSING SECTION AT NEMBE CREEK CAWTHORNE CHANNEL TRUNKLINE REPLACEMENT PROJECT.

  • Client: NESTOIL
  • Status: COMPLETED PROJECT
  • Scope of work
    PROCEDURE QUALIFCATION
    MOBILIZATION OF RESOURCES TO SITE (SETTING OUT OF RESOURCES
    CLEANING AND FILLING OF LINE
    HYDROTEST OF LINE
    DEWATERING OF LINE
    DRYING OF LINE
    SITE CLEAN UP
    DEMOBILIZATION
  • Category: PRE-COM

CLEANING, GAUGING, HYDROTEST, DEWAETRING, INTELLIGENT PIGGING AND DRYING OF 30KM ODIDI- FORCADOS 16” GAS PIPELINE.

  • Client: BB GOS(SHELL) (SUBCONTRACT
  • Status: COMPLETED PROJECT
  • Scope of work
    MOBILIZATION OF RESOURCES TO SITE (SETTING OUT OF RESOURCES)
    CLEANING AND FILLING OF LINE
    HYDROTEST OF LINE
    INTELLIGENT PIGGING OF LINE
    DEWATERING OF LINE
    DRYING OF LINE
    PURGING OF LINE
    SITE CLEAN UP
    DEMOBILIZATION
  • Category: PRE-COM

DAMAGE ASSESSMENT AND INTEGRITY TESTING OF PIPELINES AND FACILITIES.

  • Client: CHEVRON
  • Status: COMPLETED PROJECT
  • Scope of work
    MOBILIZATION OF RESOURCES TO SITE (SETTING OUT OF RESOURCES
    CLEANING AND FILLING OF LINE
    HYDROTEST OF LINE
    DEWATERING OF LINE
    DRYING OF LINE
    PURGING OF LINE
    SITE CLEAN UP
    DEMOBILIZATION
  • Category: PRE-COM